C-Connecng the EBM
Rack installation
!
A small amount of arcing may occur when connecng an EBM to the UPS. This is
normal and will not harm personnel. Insert the EBM cable into the UPS baery connec-
tor quickly and rmly.
To increase stability, it is preferable to place the EBM below the UPS.
Extension Baery Module (EBM) Eaton 9AEBM24R is compable only with 9A1000IR
UPS, Eaton 9AEBM48R is compable only with 9A2000IR UPS and Eaton 9AEBM72R is
compable only with 9A3000IR UPS. UPS must be switched o and disconnected from
the power supply prior to baery installaon. Only qualied service personnel are al-
lowed to install the EBM when UPS is working.
1. Remove UPS and EBM front panel.
2. Plug the EBM power cable(s) into the baery connector(s). Up to 4 EBMs could be con-
nected to the UPS. Verify that the EBM connecons are ght, and that adequate bend
radius and strain relief exist for each cable.
3. Put back the UPS and EBM front panel.
4. Select the number of EBM connected through the LCD, please refer to page 21.
3.6 Connecon other accessories
If you ordered other UPS accessories, refer to specific user manuals to check the
connetion to the UPS.