EasyManua.ls Logo

Eaton 9A UPS - Installation Procedures

Eaton 9A UPS
46 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
9A UPS 1-3K
3 Installaon
3.1 Inspecng the equipment
If any equipment has been damaged during shipment, keep the shipping cartons and pack-
ing materials for the carrier or place of purchase and le a claim for shipping damage. If you
discover damage aer acceptance, le a claim for concealed damage.
To le a claim for shipping damage or concealed damage:
File with the carrier within 15 days of receipt of the equipment.
Send a copy of the damage claim within 15 days to your service representave.
Check the baery recharge date on the shipping carton label. If the date has
passed and the baeries were never recharged, do not use the UPS. Contact your ser-
vice representave.
3.2 UPS Tower 1-3KVA
A-Checking the accessory kit
Verify that the following addional items are included
with the UPS:
1 9A UPS 2 Quick start
3 Safety instrucons 4 RS232 communicaon cable
9A
Hz
Vac
Hz
Vac
+
OUTPUT LOAD
INPUT BATTERY
ON OFF SELECT ENTER
9A
Hz
Vac
Hz
Vac
+
OUTPUT LOAD
INPUT BATTERY
ON OFF SELECT ENTER
1
2
3
4

Related product manuals