UPS System Installation
4-4 Eaton
®
Power Xpert
®
9395P-900 UPS Installation and Operation Manual
P-164000501—Rev 09 www.eaton.com/powerquality
Figure 4-2. Removing the ISBM Section Right Side Shipping Bracket
4. Using a forklift (see the caution statement at the beginning of this procedure), raise the cabinet until the
cabinet bottom clears the pallet by approximately 3 mm (1/8”).
5. Pull the pallet from under the cabinet. Discard or recycle the pallet and shipping brackets in a responsible
manner.
6. Carefully lower the cabinet until the cabinet base contacts the floor.
7. Repeat Steps 2 through 6 for the remaining cabinet.
8. Proceed to paragraph 4-3.
Shipping Bracket
Bolts
Shipping Bracket
Bolts
Pallet
Right Side Shipping
Bracket
ISBM Removable
Front Panels
For 4-wire
systems only