66 Eaton Power Xpert 9395 UPS Installation and Operation Manual 164201764—Rev 14
Figure 31. ISBM Section Conduit and Wire Entry Locations
Top Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
TOP VIEW
Interface Entry Conduit Landings for TB1
through TB3 Wiring and X-Slot Connections
(Remove panels to drill or punch conduit holes.)
Bottom Entry Conduit Landing for AC
Input and Output, and DC Input
(Remove panel to drill or punch
conduit holes.)
BOTTOM VIEW
Front
Front
4. Locate the external wiring terminal hardware kit packed on the bottom left side of the ISBM section.
5. Using hardware from the external wiring terminal hardware kit (see Table 14), connect phase A, B, and C
rectifier input power wiring from the utility source to the rectifier input terminals in the ISBM section. See
paragraph 3.2.4 UPS System Power Wiring Preparation for wiring and termination requirements.
6. If installing a UPS configured as an Input Output Module (IOM), proceed to Step 8; otherwise, proceed to
Step 7.
7. Using hardware from the external wiring terminal hardware kit (see Table 14), connect phase A, B, and C,
and Neutral (if required) bypass input power wiring from the utility source to the bypass input terminals and