INSTALLATION
EATON Powerware
®
9125 (9910-E30) UPS Installation Guide for IBM
®
Applications S 164201696 Rev 1
18
UPS Installation
NOTE Do not make unauthorized changes to the UPS; otherwise, damage may occur to
your equipment and void your warranty.
To install t he UPS:
1. If you are installing power management software, connect your
computer to the UPS communication port or optional X-Slot
®
card
(see Table 15 on page 44). For the communication port, use only
the serial cable supplied in the E30 accessory kit.
Battery Connector with Cover
Output Receptacles (Four 10A, IEC 320-C13) UPS Input Connector
(16A, IEC-320)
UPS Output Receptacle (16A, IEC 320-C19)
REPO Port
Communication Port
X-Slot
Communication
Bay
Circuit Breaker
Figure 25. UPS Rear View
2. If an emergency power-off (disconnect) switch is required by local
codes, see the f ollowing section, “Remote E mergency Power-off
Installation” to install t he REPO switch before powering on the
UPS.
3. Continue to “Power Connections and Startup” on page 20.
Remote Emergency Power-off Installation
The E30 includes a REPO port that allows power to be switched off at
the UPS output receptacles from a customer-supplied switch in a
remote location.
The REPO feature shuts down the protected equipment immediately
and does not follow the orderly shutdown procedure initiated by any
power management software.
Any devices that are operating on battery power are also shut down
immediately. When the REPO switch is reset, the equipment will not
return to battery power until the UPS is manually restarted.