INSTALLATION
EATON Powerware
®
9125 (9910-E30) UPS Installation Guide for IBM
®
Applications S 164201696 Rev 1
4
Table 7. FC 6570 PDM (42R4320)
Quantity Eaton PN Description
1 103003920-3991 FC 6570 PDM
1 164201392 Powerware 9125 PDM (2500/3000 VA) User’s Guide
1 103005260 Accessory Kit:
S (1) 2.5m (8 ft) IEC 320-C19 to IEC 320-C20 Jumper Cable (152601948-001)
S (2) Joining Brackets (157605902-003)
S (4) Joining Bracket Screws (M4×10 mm) (180500153-306)
UPS I nternal Battery Connection
NOTE Check the battery recharge date on the shipping carton label. If the date has expired
and the batteries were never recharged, do not use the UPS. Contact your service
representative.
To ensure proper battery operation before installing the UPS:
1. Verify that the UPS is off and unplugged.
2. Remove the UPS front cover (see Figure 1).
Figure 1. Removing the Front Cover
3. Connect the internal battery connector (see Figure 2).
Figure 2. Connecting the Internal Battery Connector