INSTALLATION
EATON Powerware
®
9125 (9910-E30) UPS Installation Guide for IBM
®
Applications S 164201696 Rev 1
11
Tower Setup
The UPS and any optional cabinets (PDM or EBM) must be stabilized
with pedestals or joining brackets. The setup varies depending on the
number of cabinets you are installing:
1. For one cabinet, both sets of pedestals must be installed (provided in
the E30 accessory kit). Complete Steps 2 through 4.
For two cabinets, the pedestals and joining brackets must be
installed. Skip to Step 5 or 6.
For three or more cabinets, the pedestals are not installed. Skip to
Step 8 to install the joining brackets.
2. Place the UPS horizontally, so that the left end of the cabinet is
accessible (see Figure 12).
3. Align the pedestals over the holes on the end of the UPS as shown
in Figure 12. Secure the pedestals with the screws provided in the
accessory kit.
Figure 12. Installing UPS Pedestals (for One Cabinet)
4. Carefully position the cabinet upright with the air vents at the top
(see Figure 13).
Continue to “UPS Installation” on page 18.