INSTALLATION
EATON Powerware
®
9125 (9910-E30) UPS Installation Guide for IBM
®
Applications S 164201696 Rev 1
12
Air Vents
Figure 13. Pedestals with One Cabinet
5. UPS with EBM: Place the UPS horizontally so that the left end of the
cabinet is accessible (see Figure 14).
Figure 14. Installing UPS Pedestals
Place the EBM upside down so that the right end of the cabinet is
accessible (see Figure 15).
Figure 15. Installing EBM Pedestals