6. UPS with PDM: Place the PDM horizontally so that the left end of the
cabinet is accessible (see Figure 16).
Figure 16. Installing PDM Pedestals
Place the UPS upside down so t hat the right end of the cabinet is
accessible (see Figure 17).
Figure 17. Installing UPS Pedestals
7. Position two of the pedestals over the edge of each cabinet so that
the weight of the unit is evenly distributed. Secure the pedestals
with the screws provided in the accessory kit.
8. Carefully position the cabinets upright with the air vents at the top
(see Figure 18 or Figure 19).
UPS with EBM UPS with PDM
Air Vents
Figure 18. Pedestals with Two Cabinets