INSTALLATION
EATON Powerware
®
9125 (9910-E30) UPS Installation Guide for IBM
®
Applications S 164201696 Rev 1
14
NOTE Pedestals are required for installations with one or two cabinets. Joining brackets
are required for installations with two or more cabinets.
Air Vents
Figure 19. Tower Setup with Three Cabinets
9. Align each joining bracket with the adjacent corner screw holes and
secure with the supplied screws (see Figure 20).
Joining Bracket
EBM
UPS
Joining Bracket
Figure 20. Installing the Joining Brackets (Top View with Pedestals)
10. If installing additional cabinets, repeat Step 9 for each cabinet.
11. Continue to the following section, “EBM Installation” or “PDM
Installation” on page 17.