EasyManua.ls Logo

Eaton Powerware 9125 - Power Connections and Startup

Eaton Powerware 9125
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION
EATON Powerware
®
9125 (9910-E30) UPS Installation Guide for IBM
®
Applications S 164201696 Rev 1
20
4. Reconnect the REPO connector to the REPO port.
Pin 1 Pin 2
Figure 26. REPO Connector
5. Verify that the externally-connected REPO switch is not activated to
enable power to the UPS output receptacles.
6. Plug in the UPS and start the UPS by pressing the On
button.
7. Activate the external REPO switch to test the REPO function.
8. De-activate the external REPO switch and restart the UPS.
Power Connections and Startup
The device power cord connection(s) determines if the setup can
provide dual-redundant power to the protected device(s). See Figure 27
for a non-redundant powered device, Figure 28 for a dual-redundant
powered device, or Figure 29 for a UPS providing non-redundant power
to a device w ith r edundant power supplies.
Legend (Figure 27, Figure 28, and Figure 29)
1
UPS to utility (mains) power cord
2
Device to UPS power cord
3
Device to utility (mains) power cord

Other manuals for Eaton Powerware 9125

Related product manuals