EasyManua.ls Logo

Edwards STP-451C - Installation of the STP Pump

Edwards STP-451C
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
STP-301/451 Series Instruction Manual
4-1
Installation
4 Installation of the STP Pump
4.1 Name and Function of Each Part
(1) Inlet Port Flange (ICF
*1
, VG
*1
, ISO, and other)
z Connected to the vacuum equipment (at the high vacuum side).
(2) Outlet Port Flange (KF
*2
25)
z Connected to the inlet port side of the backing pump.
(3) STP Connector (41 pins)
z Connected to the STP connection cable.
(4) Ground Terminal
z Used for grounding.
Connect the ground cable between this terminal and the ground terminal of the
STP control unit.
The ground terminal is marked with
label.
(5) Purge Port (KF
*2
10)[Chemical Specific Pump (Type C)]
z Introduces a purge gas.
This port is attached only to the chemical specific pump (type C). In order to
protect the inside of the STP pump when pumping reactive or corrosive gases.
The STP pump is delivered with a blank flange attached to this port.
*1
: JVIA Standard
*2
: JIS

Table of Contents

Related product manuals