
Do you have a question about the EFI Fiery and is the answer not in the manual?
| Category | Server |
|---|---|
| Processor | Intel Xeon |
| Operating System | Linux |
| Connectivity | Ethernet, USB, optional Wi-Fi |
| Supported Printers | Varies by model (designed to support specific printer models from various manufacturers) |
| Software | Fiery Command WorkStation |
Provides an overview of the FC integrated server and its role in production workflow.
Outlines general precautions and tool acquisition before servicing the FC integrated server.
Details essential safety measures, including handling LCD and avoiding lifting by the top panel.
Explains how to create an electrostatic discharge safe environment for component handling.
Lists the necessary tools and parts for installing or servicing the FC integrated server.
Describes the FC integrated server's control panel, including its display and buttons.
Explains how to use the control panel buttons and interpret network status LEDs.
Details procedures for starting, shutting down, restarting, and rebooting the FC integrated server.
Defines key terms related to system restarts like soft reset and hard reset.
Introduces the chapter's scope on inspecting, removing, and replacing hardware components.
Provides diagrams illustrating the front panel, connector panel, and internal views of the server.
Details procedures for shutting down the system and opening the FC integrated server.
Covers procedures for removing and replacing the User Interface Board and Motherboard.
Explains the process of installing the Fiery Central System Software using provided DVDs.
Guides through installing the FC integrated server system and user software from DVDs.
Details the steps required to install the hardware security key for licensing.
Explains how to view and manage Fiery Central licenses and features.
Covers initial server configuration, including printer groups and settings.
Identifies common problem areas and suggests general troubleshooting steps.
Provides quick checks for obvious problems like loose connections before component replacement.
Guides through checking external and internal cable and board connections.
Details a component-by-component inspection to verify system installation and configuration.
Lists error messages and conditions with possible causes and suggested corrective actions.
Details the server's CPU, memory, storage, and other hardware specifications.
Provides operating environment, power supply, dimensions, and weight details.
Describes supported network protocols and connectivity options.
Lists government standards and safety approvals met by the FC integrated server.
Outlines the general process for removing the server from furniture for service.
Step-by-step guide to detach the FC integrated server and its monitor from the furniture.
Instructions for reassembling the FC integrated server and monitor onto the furniture stand.