EasyManua.ls Logo

Endress+Hauser Liquistation CSF34 - Mechanical Connection and Foundation Plan; Sample Intake Connection Specifications

Endress+Hauser Liquistation CSF34
210 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting Liquistation CSF34
18 Endress+Hauser
5.1.3 Mechanical connection
Foundation plan
302 (11.9)
195.4 (7.69)
C
C
D
B
A
A
AA
137.4 (5.41)
355 (14.0)
61 (2.4)
605 (23.8)
730 (28.7)
786 (30.9)
214 (8.43)
255 (10.0)
311 (12.2)
305 (12.0)
33.6 (1.32)
A0024406
 8 Foundation plan. Unit of measurement mm (in)
A Fasteners (4 x M10)
B Cable inlet
C Outlet for condensate and overflow > DN 50
D Sample supply from below > DN 80
--- Dimensions of Liquistation
5.1.4 Connection for sample intake and for version with sample
pump
Maximum suction height:
Vacuum pump: option 8 m (26 ft)
Peristaltic pump: standard 8 m (26 ft)
Maximum hose length: 30 m (98 ft)
Hose connection diameter
Vacuum pump: 10 mm (3/8 in) 13 mm (1/2 in) , 16 mm (5/8 in) or 19 mm (3/4 in)
internal diameter
Peristaltic pump: 10 mm (3/8 in) internal diameter
Intake speed:
> 0.6 m/s (> 1.9 ft/s) for 10 mm (3/8 in) ID, as per Ö 5893, US EPA
> 0.6 m/s (> 1.9 ft/s) for ≤ 13 mm (1/2") ID, as per EN 25667, ISO 5667
> 0.5 m/s (> 1.6 ft/s) for ≤ 13 mm (1/2") ID, in accordance with EN 25667, ISO 5667
Note the following when erecting the device:
Always lay the suction line so that it slopes upwards from the sampling point to the
sampler.
The sampler must be located above the sampling point.
Avoid siphoning effects in the suction line.

Table of Contents

Other manuals for Endress+Hauser Liquistation CSF34

Related product manuals