Proline Promag 300 HART Table of contents
Endress+Hauser 3
Table of contents
1 Manufacturer's Declaration .... 4
1.1 Safety-related characteristic values ..... 5
2 Certificate ....................... 8
3 About this document ........... 9
3.1 Document function ................... 9
3.2 Using this document .................. 9
3.3 Symbols ............................ 9
3.4 Supplementary device documentation .. 10
4 Design .......................... 11
4.1 Permitted device types ............... 11
4.2 Marking ........................... 13
4.3 Notes on the redundant use of multiple
sensors ............................ 14
4.4 Basic conditions for use in safety-
related applications ................. 16
4.5 Safety measured error ............... 17
4.6 Useful lifetime of electrical
components ........................ 19
5 Commissioning (installation
and configuration) ............ 19
5.1 Requirements for the personnel ....... 19
5.2 Installation ........................ 19
5.3 Commissioning ..................... 19
5.4 Operation ..........................20
5.5 Parameter configuration for safety-
related applications ................. 20
6 Operation ...................... 29
6.1 Device behavior during power-up ...... 29
6.2 Device behavior in safety function
demand mode ...................... 29
6.3 Safe states ......................... 29
6.4 Device behavior in event of alarms and
warnings .......................... 29
6.5 Alarm and warning messages ......... 30
7 Proof testing ................... 30
7.1 Test sequence A (PTC = 99 %) ........ 32
7.2 Test sequence C (PTC = 98 %) ......... 35
7.3 Test sequence D (PTC = 36 %) ........ 36
7.4 Test sequence E (PTC = 19 %) ......... 40
7.5 Test sequence F (PTC = 0 %) .......... 41
7.6 Verification criterion ................ 43
8 Repair and error handling .... 43
8.1 Maintenance ....................... 43
8.2 Repair ............................. 43
8.3 Modification ....................... 44
8.4 Taking out of service ................ 44
8.5 Disposal ........................... 44
9 Appendix ...................... 44
9.1 Structure of the measuring system ..... 44
9.2 Commissioning or proof test report .... 47
9.3 Verification or calibration ............ 49
9.4 Version history ..................... 49