EMP-9000/8000
3-16Revision:A SEIKO EPSON
3.2.12. Power Supply Unit
1. Disconnect cable connect on the Ballast Unit and Safety Swich.
2. Remove two screws(Screw, CC M3x6) fixing the Power Supply Unit, then detach the Power
Supply Unit.
Figure3-20
3.2.13. Ballast Unit
1. Disconnect cable conect on the Power Supply Unit and Safety Swich.
2. Remove two screws(Screw, CC M3x6) fixing the Ballast Unit, then detach the Ballast Unit.
3. Remove a screw(Screw, CBP-tite M3x8) fixing the RC Receptor Board Assy, then detach
the RC Receptor Board Assy on the Balast Unit.
Figure3-21
Ballast Unit
Power Supply Unit
RC receptor board
Ballast unit