EasyManua.ls Logo

Evco EVBOX1 EVB1206 - Page 8

Evco EVBOX1 EVB1206
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EVCO S.p.A.
EVBOX1 | Installation guide ver. 2.0 | Code 144BOX1E204
page 8 of 100
The following tables show the purchase codes.
Switchboards for single-phase cold rooms (3)
EVB1204N9
EVB1206N9
EVB1206N9M (1)
EVB1206N9D (2)
EVB1216N9
EVB1216N9M (1)
EVB1216N9D (2)
EVB1246N9D (2)
EVB1256N9D (2)
Notes
(1) with magneto-thermal switch
(2) with differential magneto-thermal circuit breaker
(3) also available in version with direct loads connection (add “XXC” after “9” or “XC” after “M” and “D” to the purchase code).
Switchboards for single-phase cold rooms with three-
phase defrost heater management
EVB1226N9XXC
EVB1236N9XXC
Switchboards for single-phase cold rooms with data
logging extension for EN 12830 standard compliance
(2)
EVB1214N9XLC
EVB1216N9XLC
EVB1216N9MLC (1)
EVB1256N9MLC (1)
Notes
(1) with magneto-thermal switch
(2) also available with 2 temperature probes included (NTC sensor, cable 3 m long); SD card not included.

Table of Contents

Related product manuals