EasyManua.ls Logo

Everbilt HDCWJ10 - Page 17

Everbilt HDCWJ10
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17 HOMEDEPOT.COM
Please contact Everbilt at 1-844-883-1872 for further assistance.
Deep Well Installation (continued)
9
Removing the elbow insert from
the pump body
Pull out the pressure tube from the 90° elbow insert.
Unthread and remove the elbow insert from the pump body.
10
Connecting the pressure gauge
to the elbow insert hole
Wrap the threads of the 1/4 in. pressure gauge (included)
with thread tape and thread it in the elbow insert hole.
Cut off the expanded portion of the pressure tube.
Cut 1/2 in.
11
Priming the pipe & pump
NOTE:
pipes and the pump completely.
NOTE: If the pump does not hold its prime,
inspect all pipes and connections for leaks, and
repair the leaks.
back to the tee.
12
Connecting the pressure regulator
to the pump
NOTE: This pressure regulator is a normally-closed
valve installed at the discharge of the pump to provide an
and provide back pressure for the ejector. Failure to use this
item may result in a loss of prime and/or a low pressure.
Wrap thread tape around the threads of a 1 in. pressure
regulator.
Using a pipe wrench, thread the 1 in. pressure regulator into
the top of the pump.
(WW) Pressure regulator

Table of Contents

Related product manuals