IONPURE
®
MX CEDI Modules
Page 8 of 32 IP-MAN-MX-Rev E
water requirements change, contact the IONPURE Technical Support department for
assistance.
• Once every six months:
o Make sure all wiring connections are tight
o Test safety interlocks such as flow switches or connections to upstream
equipment
1.5. Shutdown Precautions
• Confirm that the pressure in the unit is relieved until all pressures inside the unit are
atmospheric. (i.e., all pressure gauges should read zero).
• Drain standing water and plug all inlets and outlets.