EasyManua.ls Logo

FAAC DAAB MT - MA2;MK2 Top Mounting Installation Steps

FAAC DAAB MT
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTRUCTION MANUAL MT, MA2, MK2, M10 DRIVE UNIT
10
Drive arm
3
Install the drive arm by removing the bolt and
washer / retaining ring on the output shaft from
the drive unit and pressing the arm into place.
en reinstall the bolt and washer / retaining
ring.
Gate mounting
4
Screw the gate mounting into place using two M8 bolts according to the assembly
drawing.
Link arm
5
Position the link arm
between the drive arm and
gate mounting. Screw it
into place using M12 bolts
and washers.
6
Adjust it by undoing one bolt and then screwing the arm out
or in at the gate mounting.

Table of Contents

Related product manuals