EasyManua.ls Logo

FAAC DAAB MT - General Side Installation; Mounting Plate Requirements; Drive Arm Installation

FAAC DAAB MT
30 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTRUCTION MANUAL MT, MA2, MK2, M10 DRIVE UNIT
18
Side installation
Mounting plate
1
e mounting plate is not manufactured by FAAC.
e measurement from the oor or other permanent entry level to the lower
edge of the mounting plate should be at least 2,550 mm.
e dimensions of the mounting plate should be 200 mm x 400 mm and
it should be at least 8 mm thick. It must be positioned according to the
enclosed assembly drawing. e mounting plate is to be anchored so that it
can withstand a torque of 2,000 Nm.
Example: Siporex wall - through-going M10 bolts are used.
Concrete – 10 mm resin anchor.
Steel building – square tube onto a xed building structure.
e mounting plate is also welded onto the gate surround.
Drive arm
2
Install the drive arm by removing the bolt and washer /
retaining ring on the output shaft from the drive unit and
pressing the arm into place.
en reinstall the bolt and washer.

Table of Contents

Related product manuals