INSTRUCTION MANUAL MT, MA2, MK2, M10 DRIVE UNIT
9
Gate mounting and link arm
3
Screw together the link arm with the
gate mounting and drive arm. e
lateral position of the gate mounting
can be determined when the gate is
fully closed and the drive arm and link
arm are in line.
e gate mounting should be as close
to the pivot point as possible as this
provides the best geometry.
Screw the gate mounting into place
using two M8 bolts and washers.
• Top mounting
Bracket & mounting plate
1
Positioned centrally above the gate
opening.
Dimensions and mounting according
to the point entitled "Mounting
plate" in the chapter "Installation and
commissioning; General installation"
2
Centre the plate horizontally above
the gate opening. Height dimensions
in accordance with a separate assembly
drawing. en weld the motor plate
onto the mounting plate.