INSTRUCTION MANUAL MT, MA2, MK2, M10 DRIVE UNIT
19
Gate mounting and link arm
3
Screw together the link arm with the
gate mounting and drive arm. e
lateral position of the gate mounting
can be determined when the gate is
fully closed and the drive arm and link
arm are in line.
e gate mounting should be as close
to the pivot point as possible as this
provides the best geometry.
Screw the gate mounting into place
using two M8 bolts and washers.