Multi-DENCO Installation
FläktGroup DC-2013-0101-GB • Subject to modifications • R5-08/2020 59
It is the responsibility of the installer to carry out the assessment and to prepare the EC
Declaration of Conformity. For the installation of the interconnecting pipework and
electrical cabling, the declaration must then be signed by your legally responsible rep-
resentative (which may be the Managing Director of the Company).
The installer will need to consider some or all of the following:
1. Machinery Directive 2006/42/EC
2. EMC Directive 2014/30/EU
3. Low Voltage Directive 2014/35/EU
4. Pressure Equipment Directive 2014/68/EU
5. EC type examination certificate:
6. Applied Harmonised Standards:
7. Safety of machinery: Electrical equipment:
8. Safety of machinery: Basic design, concept and technical principle:
9. EMC emissions for residential, commercial and light industrial environments:
10. EMC immunity for industrial environments:
11. Refrigerating Systems:
12. Pressure equipment for refrigerating systems and heat pumps (General piping)
13. Applied National Standards/Technical Specifications:
This assessment will need to include creating a technical file including:
1. Description of the equipment, accompanied by a block diagram.
2. Wiring, circuit diagrams, and cable sizing information.
3. Pipework layout drawing.
4. List of standards applied. (See above).
5. Records of risk assessments and assessments to standards.
6. Description of control philosophy/logic. (Controls Manual)
7. Materials list including source traceability on pressure related components
e.g. pipework, fittings, and brazing materials etc.
8. Copies of any markings and labels.
9. Copy of this manual.
10. Test reports e.g. pressure test certificates, wiring test certificates.
11. Commissioning records.
12. Declaration of Conformity.