8 Commissioning
8.1 Requirements
8.1.1 Commissioning report
– A sample of the Commissioning Report is available in this manual (chapter 13.3)
– An electronic version can be provided upon request
– The report must be completed, during commissioning, by a Service representative
or an appointed contractor
– Once completed, the report MUST be sent to your sales/service representative
– Failure to send the completed report may invalidate warranty
NOTICE
READ ALL OF THIS CHAPTER BEFORE STARTING ANY WORK.
– Different options can require different commissioning procedures (e.g. winter kit).
– This chapter applies to initial commissioning as well as re-commissioning due to
extended shut down periods or relocation.
– Only R410A can be used in Multi-DENCO systems.
Refrigerants poses hazardous risks:
– Refrigerant cylinders can be heavy.
– Refrigerant cylinders can have unstable centres of gravity.
– Refrigerants are stored or used at high pressures.
– Systems using refrigerants can be operating with very high and very
low temperatures.
– Refrigerant released into an enclosed space could cause asphyxiation and death.
During commissioning:
• Ensure a full risk assessment has been conducted.
• Ensure only qualified individuals conduct work on the system.
• Establish an exclusion zone from the system for non-essential individuals.
• Ensure that the room is well ventilated.