Before the machine is taken into use, operators must have familiarized themselves with the contents
of the chapter on safety.
This chapter is intended for operators, as dened in the section “Operators “ on page 11.
Any work not described in this chapter may only be carried out by maintenance personnel (as dened
in the section “Maintenance Personnel” on page 11).
Warning!
Before the machine can be taken into use, it must be
commissioned by maintenance personnel.
3.1 construction And operAting controls
3.1.1 configurAtion
The machine is congured as follows:
PRO PAK’R on a stand
(optional)
3 operAting instructions
Wide lm kit
See page 8
PRO PAK’R
machine
Switches /
Connectors