Installation Manual
4 COUNTRY SETTINGS
“Country settings” is a section of the app dedicated to the settings of functionalities for specic
countrieslike“Unbalancedload”orRandomDelay.Readbelowthespecicationsforeachfunction.
4.1 Unbalanced load
Unbalancedload”detectionisaspecicfunctionforpowermanagement.According
torelevantstandardsforspeciccountries,thecurrentimbalancebetweenthe
phasesmust not dier by morethan a xedvalue(dierentfor each country).
This function avoids single-phase on board chargers to withdraw an unbalanced
currentfromthegridhigherthanspeciedbylocalregulations.
Thiscongurationismandatoryinthefollowingcountries:
Germany
Austria
Switzerland
Netherlands
The function is disabled by default. To activate it, click “Country Settings” on the
PowerUp homepage and select “Unbalanced load settings. Open the drop-down
menu and select the current value according to the maximum allowable current
imbalance between the phases.
This value is 20 A for Germany and 16 A for Austria, Switzerland and Netherlands.
NOTICE
Once the function is enabled, to make the changes eective, always
restart the wallbox through the dedicated button in the homepage.
Max A 32.00
Max kW 7.40
0
1
2
3
4
5
6
7
8
9
A
B
C
D
E
F
600
sMaximum dela
y
Randomized delay
County settings
Load unbalance
OFF
600
sMax
i
mum power
County settings
Load unbalance
OFF
16A
20A
1 2