EasyManua.ls Logo

Free2Move eSolutions eProWallbox - Wall mounting

Free2Move eSolutions eProWallbox
56 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
22
Installation Manual
3.5 Wall mounting
CAUTION
The national and international building regulations set out in
IEC 60364-1 and IEC 60364-5-52 must be observed when xing
eProWallbox to the wall. Correct positioning of the charging station
is important to ensure it operates correctly.
Toxthemainbodytothewall,3 plugs (Ø 10x50 mm) are required. The plugs supplied
are universal and are suitable for solid or hollow brick walls. For installation on walls
madeofdierentmaterials(e.g.plasterboard),specicplugsarerequired,andmust
onlybeinstalledoncethemaximumpermissibleloadhasbeenveried.
Before installation, it is necessary to determine the position and distances from walls.
It is recommended to maintain a distance of 50-60 cm from other walls to
facilitate installation and maintenance.
It is also recommended to install the wallbox at a height of 130-140cm from
theoor.
To facilitate installation and wall mounting, use the supplied template to drill
the3xingholes.Thetemplateshouldalsobeusedforlevellingwithaspirit
level.
Usingadrill,make3xØ10mmholeswherethexingpointsaremarked.
The minimum depth of the holes must be 60 mm. Then remove any drilling
residue from the holes.

Other manuals for Free2Move eSolutions eProWallbox

Related product manuals