Part number 550-142-950/0122
13
FreeStyle
®
series
2
wall mount gas-fired water boiler – boiler manual
4 Converting boiler to propane continued
The jacket door must be in place during
operation.
DO NOT operate the boiler with
the jacket door removed except for inspection
and testing as directed in this manual.
Figure 16 Gas pipe re-assembled to LP venturi tting
A
3
5
Figure 17 Installer conversion label
Do not check for gas leaks with an open ame — use
bubble test. Failure to use bubble test or check for
gas leaks can cause severe personal injury, death or
substantial property damage.
6. Reinstall control module, reinstall screw to hold control
module securely in place
7. Reinstall jacket door, and secure with two (2) screws.
Mandatory control changes for fuel
conversion - Perform at start-up nal checks
8. Adjust parameter for the type of gas:
a. Put the boiler in standby mode.
b. Press the DHW buttons details 1 and 2 - Figure80,page62
for 10 seconds: the display shows “b01“ ashing.
c. Press the DHW buttons Figure80,page62 details 1 and 2
- to set parameter 00 (for use with natural gas) or 01
(for use with LP).
d. Press the Heating (+) button to scroll to Parameter “b04”.
e. Press DHW (-) to reduce the Maximum Blower
see Figure128,page101.
f. Press the (+) button to scroll to Parameter “b05”.
g. Repeat Step “e” above according to your boiler size.
h. Press the Heating (+) button to scroll to Parameter
“b06”.
i. Press DHW (-) to reduce the Minimum Fan Speed,
see Figure128,page101:
j. Press the DHW buttons details 1 and 2 -
Figure80,page62 for 10 seconds.
k. e boiler will return to standby mode.
9. Turn on gas by opening gas valve, check for leaks and continue
boiler start up and adjustments, staring on page82.
10. Test ignition system safety shuto, see page83.
11. In USA Input rates are derated 4% for each 1000 . above sea
level, beyond 2000 . in accordance with National Fuel Gas
Code, ANSI Z223.1/NFPA 54 - latest edition.
12. Using a combustion analyzer insert probe into the ue test
point, check that the CO
2
content in the exhaust, with the boil-
er operating at max. and min. ring rate, matches that given in
the technical data Figure107,page82 or Figure110,page83,
for the corresponding type of gas.
DO NOT ATTEMPT TO MEASURE VALVE
OUTLET PRESSURE. The valve could be
damaged by manometer fluid contamination.
Failure to comply could result in severe personal
injury, death or substantial property damage.
Perform Boiler Manual start-up
Follow all instructions in Boiler Manual to start-up
the boiler aer converting for propane. Because the
boiler has been changed, you must verify correct
operation, including checking combustion with
test instruments both at high re and low re as
described in the Boiler Manual, pages 81, 82 & 83
Check the correct ignition sequence of the boiler
aer the conversion, as in page90.
Failure to comply could result in severe personal
injury, death or substantial property damage.
Reinstall boiler jacket front door
Replace boiler jacket front door aer servicing.
e boiler front door must be securely fastened to
the boiler frame to prevent boiler from drawing air
from inside the boiler room. is is particularly
important if the boiler is located in the same room
as other appliances. Failure to keep the door securely
fastened could result in severe personal injury or
death.
Apply installer conversion label
1. Converting to propane ring: Aer installation is complete,
attach the propane conversion label (from kit) next to the
boiler rating label.
2. Contractor/installer is responsible for completing the informa-
tion required on label (provided in kit) and attaching installer
conversion label next to the boiler rating label.