Setting the runtime of the ash screw
Pellet feed unit ... Ash screw Runtime 5s Runtime of the ash screw
Setting the pellet filling time
Outfeeder ... Start time for 1st filling 15:00 1. Start time for filling.
This is only carried out if the fill level in the
container is under 85%.
Start time for 2nd filling 15:00 2. Start time for filling.
This is also only carried out if the fill level in
the container is under 85%.
Setting boiler times
Boiler times ... Start 1. Storage tank load 05:00
End 1. Storage tank load 10:00
Start 2. Storage tank load 17:00
End 2. Storage tank load 22:00
For systems with storage tank in
transitional operation!
Within this time window the boiler is
activated if the upper storage
temperature falls below the minimum
temperature.
Start 1. heating period 05:00
End 1. heating period 08:00
Start 2. heating period 17:00
End 2. heating period 21:00
For systems without storage tank in
transitional operation!
The boiler is activated within this time
window.
Important! DHW tank loading times
must be within the time window of the
boiler times.
Start EOS 1 08:00 1. Start time for heat exchanger cleaning
The boiler must have been in operation for
at least 2 hours since the last cleaning
Start EOS 2 15:00 2. Start time for heat exchanger cleaning
The boiler must have been in operation for
at least 2 hours since the last cleaning
4.4.2 Manual operation menu
Manual operation is used operate the relevant unit by hand:
ASH SCREW OFF For switching the ash screw on and off manually
EOS OFF For switching the heat exchanger on and off manually
FILLING OFF After activating the parameter, the container is filled with fuel, regardless of fill
level, until the function is turned off or the switch point of the level sensors is
reached. When the level sensor reaches its limit value, the fill level value is set
to 100%.
Important! Parameter only for discharge systems with suction unit