32
5.0
ATC OPERATION
5.1 CAROUSEL TYPE ATC OPERATION
5.11 Safety Rules -- READ BEFORE OPERATING ATC
CAUTION! Always follow all Lock Out Tag Out procedures before performing any maintenance
• Due to the complexity and timing of the ATC, it should only be operated with the M6 command.
• Never interrupt the tool changer in the middle of cycle, wait for it to complete the tool change.
• The carousel motor is a 3-phase motor and must be phased correctly for proper direction. The machine is
phased properly at the factory before shipment, so if the carousel rotates in the wrong direction, switch any two
incoming power wires at the disconnect. Make sure the main power breaker is off!
• M58 moves carousel position CW one position, M59 moves carousel position CCW one position.
• If the T code is programmed on the same line as the M6 command, make sure the M6 is before the T code
(example: M6T4).
5.12 Manual Operation of the Tool Changer
PROCEDURE TO BE PERFORMED BY QUALIFIED PERSONNEL ONLY
The following is the process to manually step through the tool change operation in MDI.
The proper sequence of a tool change and the respective M-codes are as follows:
1. T-code executes to move carousel to pending tool.
2. M19 orient spindle.
3. G75 FP=2 Z0, moves z axis to tool change clearance position. (Tool change clearance position is stored in Axis
MD Z1 parameter 30600 – FIX_POINT_POS[1] ).
4. M52 – Tool change carousel in position.
5. M54 - Drawbar open to unclamp tool.
6. G75 FP=1 Z0, moves z axis to tool change height position. (Tool change height position is stored in Axis MD Z1
parameter 30600 – FIX_POINT_POS[0] ).
7. M55 Drawbar close to clamp tool in spindle.
8. M53 Tool change carousel out position.
Use5.14