2.4 UNPACK AND PLACE YOUR MACHINE
To make certain that your machine installation goes smoothly, it is important that the following items are completed prior
to the arrival of the Fryer authorized service technician. This will ensure that our technician is able to provide you with
the maximum amount of training during his allocated time with you.
1. Have your rigger move the machine to the operating location, remove it from the skid and install on ALL leveling
pads.
2. Remove all packaging material and thoroughly clean the machine and inspect for hidden damage.
3. Remove all large assemblies from skids and stage next to machine to facilitate ease of assembly.
4. Install leveling pads and level machine. Level with a precision level, using the leveling screws and pads provided
with the machine.
2.5 PRIOR TO THE ARRIVAL OF THE TECHNICIAN
2.51 Installation Safety Instructions
Initial start-up of the machine must be performed by a Fryer Machine Systems authorized service technician.
2.52 Cleaning & Lubricating Machine
All protective coatings (cosmoline) must be removed before using the machine.
Be cautious when selecting a suitable cleaning agent. Paraffin applied with a clean brush will soften the protective
coating. The protective coating can then be removed with clean rags.
• WD-40 or a similar product is recommended for cleaning the machine. Do not use gasoline or any other
flammable solution to clean the machine.
• Clean all exposed ways of the bed and saddle.
2.53 Line Voltage Check
Line voltage must be ± 10% of the voltage listed on the serial number tag.
2.54 Electrical Precautions
ELECTRICAL SCHEMATICS FOR YOUR MACHINE ARE LOCATED IN THE ELECTRICAL
CABINET AND IN THIS MANUAL.
Wiring
1. Ensure that all local electrical codes are met.
2. Do not connect to the power distribution panel any power cables for devices that can cause line noise, such as
welders and high frequency quenching machines.
Grounding