BASIC INSTALLATION
2.1 WHERE TO PLACE YOUR MACHINE
Thank you for choosing Fryer Machine Systems. You have purchased a high quality, custom crafted machine tool
designed and built to provide years of trouble-free service. To ensure that your machine is properly installed we ask that
you review the following information prior to the shipment of your machine.
2.11 Foundation
Your foundation must be a minimum 6“(150mm) thick concrete slab floor and should be placed on a single slab with no
seams. Be sure to leave space around the machine for leveling components and access to the electrical cabinet.
If your floor does not meet these specifications, contact the factory for further recommendations.
Install the machine on the first or second floor. Take the stress of ceiling and foundation into careful consideration to
ensure that the machine load can be offset.
2.12 Environmental Conditions
Generally, the machine will be installed in the following conditions. However, these may change over a period of time or
in response to seasonal changes.
Supply voltage: +/- 10% of voltage listed on serial number tag.
Source frequency: ±2 Hz of frequency listed on serial number tag
Temperature effects dimensional accuracy, therefore, ambient temperatures should not exceed 105
degrees Fahrenheit. Also avoid exposing the machine to direct sunlight or heat rays which can change
the environmental temperature.
Relative Humidity: Less than 80% (Temperature changes should not cause condensation)
Atmosphere: Free from excessive dust, fumes, corrosive gases, and salt
Avoid exposing the machine to abnormal vibration.
2.2 UNLOADING YOUR MACHINE
Fryer machines are shipped on skids designed for forklift offloading. Be sure your forklift is rated for the proper weight of
the machine.
Note: If you are using a crane for offloading, please contact the factory in advance for instructions as damage can occur
if supported in the wrong locations.
2.3 RECEIVING YOUR MACHINE

we can make sure your machine is packaged to fit into your door openings.
1. Fryer machines are carefully packed to avoid damage in transit; however, we ask that you UNWRAP AND
INSPECT YOUR MACHINE AS THOROUGHLY AS POSSIBLE PRIOR TO SIGNING THE BILL OF LADING. If
a digital camera is available, pictures should be taken before the machine is moved further. Pictures should be
sent to service@fryermachine.com.
2. Place the machine in its location and complete inspection. If there is any damage to your machine, Fryer should
be notified immediately. This will enable us to provide replacement parts before the service technician arrives
install the machine.
3. If you have any questions about any of these installation instructions or other questions about your new Fryer
Machine Systems machine, please call the Fryer Service Department and one of our trained technical staff will be
happy to assist you.