manufactured by Syn-Tech Systems are warranted only to the extent covered by the original
manufacturer. Additionally, warranty is limited to approved locations (generally the continental
United States) and is not transferable except by written permission of Syn-Tech Systems.
Initialization Requirement
All FuelMaster® Fuel Management Systems must be initialized by Syn-Tech trained personnel.
Initialization is the startup inspection and tests performed to certify the installation. Initialization can
be completed only by a Syn-Tech FuelMaster® technician, or a technician who has completed
installation certification training for AIM2™. Final certification must be accomplished jointly by the
Customer and Syn-Tech trained personnel.
Safety Related Inspections and Preventative
Maintenance
AIM2™ requires no preventative maintenance to retain its user safety features. Whenever AIM2™ is
updated or repaired, a post-installation safety inspection should be performed of all wire connections
and hardware installations.
Consumables/Special Tools
Consumable/Special Tool Application
CV joint boot clamp pliers Crimp nozzle tag security clamps
Dielectric grease Prevent corrosion and protect electrical
connections exposed to the environment
12 AWG THHN stranded wire (Green) AIM2™ module ground wire(s)
Wire loom Cable/wire protection
Rubber grommets Protect cables/wires routed through drilled holes
Silicon sealant (GE blacktop/roof, 100% silicon) Seal grommets
Cable ties (black UV protected) Secure cables/wires
3M Scotch® Rubber Mastic Tape 2228 Weatherproof RFID Interface Module
18 AWG THHN stranded wire (Red, Black, Speed sensor wires
Green, White, Brown)
18 AWG THHN stranded wire (Orange, Analog chronometer wires
Blue)
AC power cord w/18 AWG conductors Power cable for FMU-3500 Programmer
and male plug