Figure 40 Frontend
Cable Connection Example (When Connecting Four DEs for Each Node in a 19-inch Rack
[2000mm]) ..............................................................................................................................................61
Figure 41 Frontend Cable Connection Example (When Connecting Six DEs for Each Node in a 19-inch Rack
[2000mm]) ..............................................................................................................................................62
Figure 42 Frontend Cable Connection Example (When Connecting 16 DEs for Each Node in a 19-inch Rack
[2000mm]) ..............................................................................................................................................64
Figure 43 Frontend Cable Connection Example (When Connecting Two DEs for Each Node in a 19-inch Rack [for GS,
1800mm])................................................................................................................................................66
Figure 44 Frontend Cable Connection Example (When Connecting Four DEs for Each Node in a 19-inch Rack [for GS,
1800mm])................................................................................................................................................67
Figure 45 Frontend Cable Connection Example (When Connecting Six DEs for Each Node in a 19-inch Rack [for GS,
1800mm])................................................................................................................................................68
Figure 46 Frontend Cable Connection Example (When Connecting Eight DEs for Each Node in a 19-inch Rack [for
GS, 1800mm])..........................................................................................................................................69
Figure 47 Frontend Cable Connection Example (When Connecting 10 DEs for Each Node in a 19-inch Rack [for GS,
1800mm])................................................................................................................................................70
Figure 48 Frontend Cable Connection Example (When Connecting 12 DEs for Each Node in a 19-inch Rack [for GS,
1800mm])................................................................................................................................................71
Figure 49 Frontend Cable Connection Example (When Connecting 14 DEs for Each Node in a 19-inch Rack [for GS,
1800mm])................................................................................................................................................72
Figure 50 Frontend Cable Connection Example (When Connecting 16 DEs for Each Node in a 19-inch Rack [for GS,
1800mm])................................................................................................................................................73
Figure 51 Backend Cable Connection Example (ETERNUS DX8100 S3 Connections in the Same Rack).....................75
Figure 52 Backend Cable Connection Example (ETERNUS DX8700 S3/DX8900 S3 Connections in the Same Rack).......
.................................................................................................................................................................76
Figure 53 Backend Cable Connection Example (When Installing 16 DEs for Each Node Connected between Multiple
Racks) ......................................................................................................................................................77
Figure 54 Unit Installation Area ...............................................................................................................................79
List of Figures
4
FUJITSU Storage ETERNUS DX8100 S3/DX8700 S3/DX8900 S3 Hybrid Storage Systems
Site Planning Guide
Copyright 2020 FUJITSU LIMITED
P3AM-9422-13ENZ0