GE HEALTHCARE
DIRECTION 5461425-8EN, REVISION 6 BRIVO XR118 SERVICE MANUAL
Chapter 5 - - Installation & Configuration Page 47
Chapter 5 - Installation & Configuration
Section 1.0
Before You Begin
Before installation work begins, the site should be checked to verify the correctness of junction box
sizes, their locations, the number and sizes of interconnecting wiring and proper power availability
in the room.
• Do not discard any packing materials such as envelopes, boxes, bags until all parts are
accounted for against the packing list.
• The distribution center or factory must be notified immediately of any damage or shortage of
parts.
Three standard boxes will be delivered: Main box, monitor and detector box.
If optional parts ordered, there will be a fourth box.
Figure 5-2 Boxes Received
Main Box Monitor Box
Detector Box Optional Box