GE HEALTHCARE
DIRECTION 5461425-8EN, REVISION 6 BRIVO XR118 SERVICE MANUAL
Chapter 5 - - Installation & Configuration Page 61
Section 7.0
System Power Up
1.) Plug the Switching Power Supply and monitor power cable into hospital main power (If
required).
2.) The dock and AP automatically boot up.
3.) Press the power button of the monitor.
4.) Press the power button on the image workstation > 2 seconds to power up the workstation.
5.) Press the power button on the image detector > 2 seconds to power up the detector.
Note: Do Not unplug the image workstation from the dock.