Application Turnover Check List
LOGIQ C9 Series – Basic Service Manual 4-27
5482298-100 English Rev. 5
Application Turnover Check List
Complete these checks before returning the scanner to
customer for use:
Software Configuration Checks
Table 4-2: Software Configuration Checks
Step Task to do Notes
1 Verify Date and Time is correct.
2 Verify that Location (Hospital Name) is correct.
3 Verify Language settings are correct.
4 Verify assignment of Print Keys.
5 Verify all of the customer’s options are set up
correctly.
Demo Option strings turn on