EasyManuals Logo

GE LOGIQ C9 Series User Manual

GE LOGIQ C9 Series
247 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #245 background imageLoading...
Page #245 background image
LOGIQ C9 Series – Basic Service Manual Index-3
5482298-100 English Rev. 5
service safety considerations, i-14
translation policy, i-2
prepeare for setup, 3-18
prerequisite
provided by customer, 8-13
probe
connect, 3-21
probe cleaning, 10-18
probe leakage current test, 10-27
probe maintenance, 10-17
basic probe care, 10-17
basic probe cleaning, 10-18
probe related checks, 10-17
probe related checks, 10-17
probes environmental requirements, 2-11
operational and storage temperature for probes,
2-11
product icons, 1-10
product locator installation card, 3-41
products covered by this manual, 1-5
Purchaser responsibilities, 2-13
R
rear panel
connections, 3-21
receiving and unpacking, 3-6
receiving the product, 3-7
recycling information
packing materials, 3-17
required facility needs, 2-14
requirements, 2-3
requirements verification, 3-19
returning/shipping probes and repair parts, 1-22
revision history, i-1
S
safety
human, 1-12
safety precaution messages, 1-7
safety test overview, 10-19
service safety considerations, i-14
setup
completion, 3-19
preparations, 3-18
reminders, 3-3
setup time, 3-3
setup warnings, 3-3
shipping/returning probes and repair parts, 1-22
shock and tilt indicators
position, 3-9
shock indicator, 3-7
site preparations, 2-1
time and manpower requirements, 2-11
software loading, 8-13
software/hardware compatibility, 9-4
software-hardware
compatibility, 5-3
specifications, 3-19
electrical specifications, 3-20
physical dimensions, 3-19
standard GE tool kit, 10-8
standard hazard icons, 1-8
statement
certified electrical contractor statement, i-12
system
specifications, 3-19
system checks, 10-13
system maintenance, 10-12
physical inspection, 10-15
preliminary checks, 10-12
system manufacturer, 1-26
system requirements verification, 3-19
system setup, 3-1
T
tilt and shock indicators
position, 3-9
tilt indicator, 3-7
time and manpower requirements
site preparations, 2-11
tools required, 10-8
special tools, supplies and equipment, 10-11
standard GE tool kit, 10-8
trademarks, i-15
translation policy, i-2
transport
damage, i-12
transportation
shock indicator, 3-7
tilt indicator, 3-7
transportation box label, 3-11
U
unpacking, 3-6
unpacking instructions, 3-12
USB
flash card
connect, 3-21
V
verification
system requirements, 3-19
verify customer order, 3-18
voltage settings, 3-20
W
warnings, 10-3
dangerous procedures, 1-20
receiving and unpacking, 3-6
what is EMC?, 1-23
when there’s too much leakage current, 10-30

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GE LOGIQ C9 Series and is the answer not in the manual?

GE LOGIQ C9 Series Specifications

General IconGeneral
BrandGE
ModelLOGIQ C9 Series
CategoryMedical Equipment
LanguageEnglish

Related product manuals