EasyManua.ls Logo

GE LOGIQ C9 Series - Page 84

GE LOGIQ C9 Series
247 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System Setup
3-8 LOGIQ C9 Series – Basic Service Manual
5482298-100 English Rev. 5
Examine all packages
Examine package closely at time of delivery, as described in the
procedure below.
Table 3-3: Examine all packages
Step Task Illustrations
1. Is damage apparent?
• If YES; continue with the instructions in
‘Damage in transportation’ on page 3-11.
• If NO; continue with the next step.
2. Is the Tilt Indicator red colored inside the
middle of the indicator?
• If YES: The Tilt Indicator has been
activated. Continue with the instructions in
‘Damage in transportation’ on page 3-11
before you continue with the next step.
• If NO: continue with the next step.
1 - Red Color
3. Continue with the instructions in ‘Unpacking
the LOGIQ C9 Series’ on page 3-12.

Table of Contents

Related product manuals