Maintenance: Check out Procedure
Check out Procedure
Operational Checks
Perform the functional checkout procedures that are applicable to the
replacement procedure that was performed.
1. Verify the power-up self-test passed. See “Power-up Self-Test” on
page 3-3.
2. Verify the serial number restored successfully. See “Serial Number
Entry” on page 4-30.
3. For units with the option enabled, verify the option enabled again
successfully (Enabled options will have in front of the options in
option activation window). See MAC 600 Operators Manual for
“option entry” details.
4. Verify that the new battery was charged successfully by checking the
battery full indicator after it has been charged for 2-3 hours
charging. See MAC 600 Operator’s Manual.
5. Verify the time and date were set successfully. See “Setting the date
and time” in the MAC 600 Operator’s Manual.
Diagnostic Tests
1. Verify the System /Firmware Version was successful. See “Testing
the System Information” on page 3-6 for more information.
2. Verify the Display Test was successful. See “Testing the Display” on
page 3-7 for more information.
3. Verify the Buzzer Test was successful. See “Testing the Buzzer” on
page 3-8 for more information.
4. Verify the Keypad Test was successful. See “Testing the Keypad” on
page 3-9 for more information.
5. Verify the Writer Tests was successful. See “Writer Test” on page 3-
11 for more information.
6. Verify the Battery Tests was successful. See “Battery Tests” on
page 3-12 for more information.
7. Verify the Communication Tests was successful. See
“Communication Tests” on page 3-12 for more information.
8. Verify the SD card test was successful. See “SD Card Tests” on
page 3-14 for more information.
Electrical Safety Checks
1. Leakage current tests.
2. Ground continuity test.