EasyManua.ls Logo

GE Moisture Target Series 6

GE Moisture Target Series 6
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2. Installation
Moisture Target Series 6 Hygrometer User’s Manual 3
Chapter 2. Installation
2.1 Introduction
Installing the MTS6 includes the following steps:
selecting the recorder output
mounting the electronics unit
mounting the sample system
installing the probe into the sample system
wiring the input power
wiring the probe and alarm connections
WARNING! To ensure safe operation, the MTS6 must be panel
mounted and operated as described in this manual. Also,
be sure to follow all applicable local safety codes and
regulations for installing electrical equipment.
Note: For the non-enclosure MTS6 package, please refer to Appendix D for
mounting and installation.

Table of Contents

Related product manuals