EasyManua.ls Logo

GE Moisture Target Series 6

GE Moisture Target Series 6
132 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2. Installation
Moisture Target Series 6 Hygrometer User’s Manual 7
2.2 Selecting the Recorder Output (cont.)
4. Locate switch S1 (see Figure 8, highlighted area).
CAUTION! Use proper ESD grounding prior to changing the
switch.
5. Set switch S1 to the desired position: V for voltage or I for current.
Figure 8: Switch S1 on the Main PC Board
6. After setting the switch, replace the cover and reinsert the rear
enclosure screw.

Table of Contents

Related product manuals