Drawout Case745
Transformer Management Relay
Installation
http://www.GEindustrial.com/multilin
3–2
GE Multilin
FIGURE 3–2: Single SR Relay Panel Cutout
FIGURE 3–3: Double SR Relay Panel Cutout
Case Mounting Before mounting the SR unit in the supporting panel, remove the relay portion from
its case, as described in the next section. From the front of the panel, slide the
empty case into the cutout. To ensure the front bezel sits flush with the panel, apply
pressure to the bezel’s front while bending the retaining tabs 90°. These tabs are
located on the sides and bottom of the case and appear as shown in the illustration.
After bending all tabs, the case will be securely mounted so that its relay can be
inserted. The SR unit is now ready for panel wiring.
FIGURE 3–4: Case Mounting