EasyManua.ls Logo

GE Venue 50 - System maintenance

GE Venue 50
289 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System maintenance
Venue 50 – Basic Service Manual 10-11
5447566-100 English Rev. 7
System maintenance
Preliminary checks
The preliminary checks take about 15 minutes to perform. Refer
to the Ultrasound system user documentation whenever
necessary.
Table 10-5: System preliminary checks
Step Item Description
1. Ask and Listen Ask the customer if they have any problems or questions about the
equipment.
2. Paperwork Fill in the top of Ultrasound Inspection Certificate (see Figure 10-6 on
page 10-34). Record all probes and Ultrasound system options.
3. Power up • Turn the Ultrasound system power on and verify that all fans and
peripherals turn on.
• Watch the displays during power up to verify that no warning or error
messages are displayed.
• Where applicable, confirm that the battery is charged. If no AC Input
present, use the internal battery.
4. Probes Verify that the Ultrasound system properly recognizes all probes.
5. Displays Verify proper display on the monitor.

Table of Contents

Other manuals for GE Venue 50

Related product manuals