EasyManua.ls Logo

GE Xcellerex XDM Series - Page 233

GE Xcellerex XDM Series
322 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Make sure that the unused probe ports have been clamped, if you use a Plus
or Plus Flex bag assembly without the probes.
2
Make sure that the installed probes stay in place in the probe window during
the filling.
3
If your mixer has a weight monitoring option, monitor the weight of the
added liquid on the local control software home screen (XDUO mixer), or on
the weight monitor display (XDM mixer). Decrease the filling speed, when
the weight approaches the designated level.
4
Stop filling the bag when the designated liquid weight is reached.5
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD 233
7 Operation
7.4 Add liquid contents

Table of Contents

Related product manuals