EasyManua.ls Logo

GE Xcellerex XDM Series - Page 235

GE Xcellerex XDM Series
322 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
The lid of the 1000 L mixer has two center openings. Make sure that the
powder addition port is inserted into the opening as shown in the following
illustration.
9
Adjust the lines through the rectangular lid openings.10
If needed, clamp the fill lines and disconnect the liquid source.11
Xcellerex XDM 50-1000, XDUO 100-1000 mixers Operating Instructions 29251615 AD 235
7 Operation
7.4 Add liquid contents

Table of Contents

Related product manuals