6 Commissioning
This chapter
contains information for the initial and any subsequent commissioning of
the valve. It also describes the necessary checks and tests.
It is addressed to all persons who carry out actions related to the valve.
INFO During all commissioning, observe the chapter
2 Safety
of this Operating
Instructions.
6.1 Preparing commissioning
For initial commissioning, the following principles apply:
T
ake
protective measures against dangerous contact voltages in accordance with
pertinent regulations.
The valve must be completely assembled and correctly adjusted. All screw connec-
tions must be securely tightened. All electrical cables must be installed correctly.
Reliably secure machine parts which have already been connected against inadver-
tently being switched on.
Relubricate all lubricating points.
Make sure lubricants are used properly.
After conversion of the valve, residual risks must be reassessed.
Notes on commissioning
Before starting commissioning observe the following:
Make sur
e that ther
e are no foreign materials in the system.
Actuate the valve once by applying compressed air.
Clean the pipe system prior to the rst product run.
During commissioning, regularly check all sealing points for leaks. Replace defective
seals.
6.1 Preparing commissioning - 41 / 104

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GEA VARIVENT X R Series and is the answer not in the manual?

GEA VARIVENT X R Series Specifications

General IconGeneral
BrandGEA
ModelVARIVENT X R Series
CategoryControl Unit
LanguageEnglish

Related product manuals