EasyManuals Logo

GESTRA LRR 1-52 Original Installation & Operating Manual

GESTRA LRR 1-52
72 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #39 background imageLoading...
Page #39 background image
39LRR 1-52, LRR 1-53, URB 55 - USA - Installation & Operating Manual - 850703-00
Visual display and operating unit URB 55
Switching on the supply voltage
Please switch on the supply voltage for the LRR 1-5x conductivity controller and the URB 55 visual
display and operating unit.
For the controller(s), the LED first lights up amber, then green.
The home screen of the URB 55 visual display and operating unit appears.
If two controllers are connected to the
visual display and operating unit, both
controllers will be shown, see example.
If you tap one of the controller
overview screens, a full screen
for that controller will open on the
display, see screenshot below.
If just one controller is connected, the
home screen of this controller will be
shown (example).

Table of Contents

Other manuals for GESTRA LRR 1-52

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the GESTRA LRR 1-52 and is the answer not in the manual?

GESTRA LRR 1-52 Specifications

General IconGeneral
BrandGESTRA
ModelLRR 1-52
CategoryController
LanguageEnglish

Related product manuals