EasyManua.ls Logo

Getinge HS33 - Test Processes Included; Optional Processes

Getinge HS33
27 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 17 of 27
TEST PROCESSES INCLUDED
Two test processes are included:
P04 Bowie & Dick test
A test cycle to control the air removal and steam penetration of the sterilizer
cycle. Password (558) required. Can also be used for Helix test.
Total process time with test pack ~18 min
P06 Leak test
The sterilization process is sensitive to residual air in the chamber. If the
chamber is not leak-tight, sterilization effi ciency may be impaired. Getinge
vacuum sterilizers are equipped with a fully automatic leak test process to
confi rm leak-tightness of the chamber for the daily use.
Password (558) required.
Total process time ~30 min
P05 Flash 134 °C
A rapid process for single, unwrapped solid instruments. The cycle can also be
used to warm up the sterilizer before daily use or leak test. Please note that the
unwrapped sterilized instruments are intended to be used either immediately
or for non-sterile storage, transport and use!
Password (558) required.
Total process time
Empty chamber ~14 min
P22 Heating-up program
Only for double door version. Password required (558).
Total process time ~9 min

Related product manuals